Send your data

METHODHow a survey is made

One leg, six steps.

A survey team of two or three repeats the same few steps for every leg, often a hundred times a trip. Here is one leg, start to finish, with the readings from a real plot.

Stations

Pick a point you can see from the last one

A station is any spot with a clear line to the previous station: a rock knob, a mark on the wall, a spot on the floor. It doesn't have to be marked forever, but every reading starts and ends there.

The shot

Tape, compass, clino

From one station to the next you take three readings: the distance, the bearing from north and the angle up or down. A DistoX takes all three in one laser shot.

LRUD

How far to the walls

At each station, the distance left, right, up and down. Four numbers give the passage its width and height.

The sketch

Draw what the numbers can't

The sketcher draws walls, boulders, water and sand in pencil around the station line, on waterproof paper or a tablet.

Back-sight

Read it again, the other way

Reading the leg from the far end should give the bearing ±180° and the same angle with the opposite sign. If not, someone redoes it.

Plot and close

Calculate, then check the loop

Back on the surface the readings become coordinates. Where the survey loops back on itself, the gap between start and finish is the error.

S.02The notebook

A page of readings

This is what arrives on our desk: a table of legs and a sketch around them. These twelve legs are the start of the cave on the home page.

FromToTape mComp °Clino °LRUD

S.03British Cave Research Association

The grades, in full

The BCRA scale dates from the 1960s. A grade has two parts: a number for the survey line and a letter for the passage detail. Most of our work is 5C or 5D.

Survey line
1A sketch, no measurements.
2Between 1 and 3. Use only if necessary.
3Rough magnetic survey. Angles ±2.5°, distances ±50 cm, stations within 50 cm.
4Better than 3, short of 5. Use only if necessary.
5Magnetic survey. Angles ±1°, distances to the nearest centimetre, stations within 10 cm. Calibrated instruments; coordinates calculated.
6Compass and clino to ±0.5°, stations within 2.5 cm, on tripods or roof hooks.
XTheodolite or total station. The drawing must say what was used.
Passage detail
AFrom memory.
BEstimated and noted in the cave.
CMeasured at the stations only.
DMeasured at the stations and wherever the passage changes.

Summary of the BCRA tables; the full definitions have notes that go with them. Normal pairs: 1A, 3B or 3C, 5C or 5D, 6D, XA to XD.

Five cave surveying instruments on a table: DistoX2, SAP2, SAP5, SAP6 and BRIC5
From top: DistoX2, SAP2, SAP5, SAP6, BRIC5. Photo: Cloud200, CC BY-SA 4.0

S.04Instruments

Mud-proof, mostly

Since around 2007 most British teams survey paperless: a laser rangefinder with a compass and clinometer built in, talking to a tablet that draws the line as you go. The first, the DistoX, was a commercial rangefinder a Swiss caver rebuilt. Cavers have built others since, like the SAP and the BRIC.

We take data from any of them, and from tape and compass too.

S.05Questions

Before you send