lever 14

BOX OPENPull 2 and 3, then 1_
BLOCK
INSTR.
WENLOCK HALT · 12 LEVERS · TYKE & SAXBY PATTERNFRAME NORMAL

A restored 1891 signal box. Twelve levers, one block bell and a qualified signaller beside you. For three hours, the line is yours to work.

How it works

Every lever is painted for its job. Red works a stop signal, yellow a distant, black a set of points, blue the lock that holds those points still. White levers are spare.

Why it's safe

Under the floor, an interlocking of iron bars stops you pulling a signal off for a route that isn't set. Try it above: lever 1 won't move until 2 and 3 are off.

The box never asks you to be clever. It asks you to do things in order.

History

The Regulation of Railways Act 1889, passed after the Armagh disaster that year, made interlocking and absolute block working compulsory on British passenger lines. Our box was built two years later.

Before boxes

Lineside signals go back to about 1832: raised flags and balls you could read from a distance. Before that, a man on a horse rode ahead of the train.

Speak
in bells.

Signal boxes talk to each other in beats on a single bell. Press one and you'll hear what the next box would hear.

01 · 3 hours

Afternoon turn

You work the steam service from 13:00 to 16:00. Our signaller books the trains in the register; you pull the levers.

£85 · 1 person, 1 guest watches

02 · 2 hours

Lamp-lit turn

The last two trains of an autumn Saturday, worked by oil lamp. The frame sounds louder in the dark.

£70 · October to March

03 · 90 minutes

Bell-code class

No trains, just the block instruments and the bell. You leave able to offer, accept and clear a train.

£30 · up to 6 people